
€110m Turin Olympic Bobsleigh Track Faces Demolition
The Cesana Pariol track, built for the 2006 Winter Games and abandoned five years later, is set to be pulled down under a 7.6 million euro tender, closing the book on the Games’ most divisive project.
By: hammadkhaksar
