
Tarbela T-5 Rockfall Floods Powerhouse — All Workers Safe, Work Halted
A weak rock mass gave way during excavation at the Tarbela Fifth Extension project on Monday, sending intake water into the tunnel and the under-construction powerhouse. Wapda says every worker was evacuated safely and the main tunnel is undamaged.
By: hammadkhaksar
